aPaid during the year
|
|
|
|
|
BLUES CARE GIVING CONTRIBUTIONS 1331 GRAND AVENUE STATION 4W526 DES MOINES,IA50309
|
|
PC |
SEE ATTACHMENT 2 |
1,413,890 |
6TH AVE CORR URBAN NEIGHBORHOOD MAIN ST PROGRAM PO BOX 8225 DES MOINES,IA50301
|
NONE |
PC |
6TH AVENUE CORRIDOR STREETSCAPE PROJECT IS TRANSFORMING THE BUILT ENVIRONMENT OF 6TH AVE IN DES MOINES USING MULTIPLE COMPLETE STREETS PRINCIPLES (REDUCED TRAFFIC LANES, A MULTI-USE PATH WITH DEDICATED SPACE FOR BICYCLISTS, WIDENED SIDEWALKS, DEDICATED PARKING, GREEN INFRASTRUCTURE, PUBLIC ART, ETC.) ENCOURAGING ECONOMIC DEVELOPMENT, COMMUNITY WELLNESS, AND ENHANCED PRIDE OF PLACE. CONSTRUCTION OF PHASE I (DES MOINES RIVER TO COLLEGE AVENUE) WAS COMPLETED IN THE SUMMER OF '20. PRELIMINARY DEMOLITION FOR PHASE II (COLLEGE AVENUE THROUGH UNIVERSITY AVENUE) BEGAN IN THE FALL OF '20 AND THE MAJORITY OF CONSTRUCTION ACTIVITY WILL OCCUR IN '21. PHASE II IS ANTICIPATED TO BE COMPLETE BY DEC OF THIS YEAR. PHASE III (UNIVERSITY AVE SOUTH TO I-235) WILL COMPLETE THE PROJECT. THE ANTICIPATED TOTAL COST OF THE THREE-PHASE PROJECT IS $9 MILLION. |
100,000 |
CATHERINE MCAULEY CENTER 1220 5TH AVENUE SE CEDAR RAPIDS,IA52403
|
NONE |
PC |
THE CATHERINE MCAULEY CENTER WILL IMPLEMENT PROGRAMMING TO PROVIDE INDIVIDUALS WITH THE KNOWLEDGE AND SKILLS TO BE SELF-SUFFICIENT IN MAINTAINING HEALTHY EATING HABITS THAT CONTRIBUTE TO POSITIVE HEALTH OUTCOMES. CMC WILL RECRUIT AND HIRE A SUPPLEMENTAL SERVICES MANAGER WHO WILL WORK WITH STAFF AND RECRUIT VOLUNTEERS TO ENSURE STAFFING IS IN PLACE FOR ITS FOOD PANTRY, COMMUNITY GARDEN, LEARNING KITCHEN AND CHILDREN'S LEARNING CENTER OPERATIONS. THE MANAGER WILL LIAISE WITH STAFF AND COMMUNITY PARTNERS TO DEVELOP APPROPRIATE PROGRAMMING AND ACTIVITIES THAT SUPPORT THE ADOPTION OF HEALTHY EATING HABITS. CMC'S SUPPLEMENTAL SERVICES (ITS FOOD PANTRY, COMMUNITY GARDEN, LEARNING KITCHEN AND CHILDREN'S LEARNING CENTER) WILL HAVE A PROMINENT ROLE IN THE EDUCATION AND EXPERIENTIAL LEARNING OF STUDENTS, CLIENTS AND RESIDENTS, LEADING TO BETTER HEALTH OUTCOMES. |
25,000 |
CENTRAL IOWA SHELTER & SERVICES 1420 MULBERRY ST DES MOINES,IA50309
|
NONE |
PC |
CENTRAL IOWA SHELTER & SERVICES PROVIDES OVER 200,000 MEALS PER YEAR TO OUR ONSITE EMERGENCY SHELTER AND PERMANENTLY HOUSED CLIENTS, AN ADDITIONAL 5,000 MEALS PER YEAR TO ANYONE WHO IS HUNGRY AND COMES IN FOR OUR FREE DAILY LUNCHES, AND 165,000 MEALS PER YEAR AT 17 MEAL SITES AS A PART OF OUR HOMELESSNESS PREVENTION OUTREACH PROGRAM. TO FULFILL THESE FOOD ACCESS NEEDS FOR THE MOST VULNERABLE MEMBERS OF OUR COMMUNITY, CISS IS UNDERGOING CONSTRUCTION OF A LARGE-SCALE AGRI-HOOD TO INCREASE FOOD PRODUCTION, BUILD CLIENT JOB SKILLS, AND DEVELOP AN ATTRACTIVE GREEN SPACE FOR DOWNTOWN EMPLOYEES AND RESIDENTS. THE AGRI-HOOD INCLUDES A GREENHOUSE WITH VERTICAL GARDENS, AQUAPONICS, OUTDOOR FLOATING GARDEN BEDS, AND AN EXPANDED ORCHARD. THE AGRI-HOOD WILL PROVIDE UP TO 60% OF OUR OWN PROGRAM MEAL NEEDS, MORE THAN DOUBLING OUR CURRENT PRODUCTION. |
100,000 |
CITY OF ALGONA 112 WEST CALL ST ALGONA,IA50511
|
NONE |
GOV |
THE CENTRAL PARK REDEVELOPMENT PROJECT WILL BREATHE NEW LIFE INTO THE CITY'S MOST PROMINENT AND ACCESSIBLE PARK. 20 YEARS AGO, THE CITY AND COMMUNITY GROUPS MADE MAJOR INVESTMENTS IN CENTRAL PARK BY REMOVING AGING AND NO LONGER SAFE EQUIPMENT AND CONSTRUCTING TWO BASKETBALL COURTS AND A SKATE PARK. CENTRAL PARK'S SKATE PARK AND BASKETBALL COURTS WERE BUILT OVER OLD TENNIS COURTS WITH ASPHALT OVERLAYS. OVER THE PAST 20 YEARS, THE BASE HAS DETERIORATED CREATING UNEVEN SURFACE, CRACKS AND LIPS WHICH ARE DETRIMENTAL TO USE OF THE FACILITIES AND DISCOURAGE USE. THE FOCUS ON THE CENTRAL PARK REDEVELOPMENT PROJECT WILL BE: RECONSTRUCTION OF SKATE CENTRAL AND BASKETBALL COURTS; NEW SIDEWALKS AND FENCING AND LIGHTING IMPROVEMENTS. THESE IMPROVEMENTS WILL CREATE A MODERN, SAFER PARK WITH A MORE USER FRIENDLY SKATE PARK AND BASKETBALL COURT THEREBY ENCOURAGING OUTDOOR ACTIVITY. |
100,000 |
CITY OF AUBURN PO BOX 238 AUBURN,IA51433
|
NONE |
GOV |
GRANT PARK TRAIL IS A 1.5 MILE LONG TRAIL THAT CONNECTS THE CITY OF AUBURN WITH A BEAUTIFUL COUNTY PARK ON THE NW SIDE OF THE CITY. THE PROJECT INCLUDES A LANDSCAPED AND COBBLESTONE TRAILHEAD AREA WITH 25' TALL STEEL TREE SCULPTURES, BENCHES, AND LIGHTING WITHIN A LARGE CIRCULAR PATTERNED PATHWAY. GRANT PARK TRAIL IS DESIGNED TO ENTERTAIN, INFORM AND MAKE PEOPLE MOVE. GRANT PARK TRAIL IS DESIGNED TO BE SO MUCH MORE THAN JUST A WALKING OR BIKING PATHWAY. WHEN TOTALLY COMPLETED GRANT PARK TRAIL WILL BE THE VENUE TO EXERCISE, LEARN, OBSERVE, APPRECIATE, AND WONDER. ALL OF THE THINGS THAT MAKE US HEALTHIER AND HAPPIER. THIS REQUEST IS FOR GRANT PARK TRAIL PHASE 2, THE BRIDGES PROJECT. PHASE 2 IS THE TRAIL SECTION THAT WILL ACTUALLY PROVIDE THE CONNECTION TO THE COUNTY PARK KNOWN AS GRANT PARK. THIS PORTION OF THE TRAIL HAS THE MUCH MORE RUGGED TERRAIN AND MEANDERS THROUGH WOODLAND AND OVER CREEKS THAT DRAIN INTO THE NORTH RACCOON RIVER. |
100,000 |
CITY OF CANISTOTA PO BOX 67 CANISTOTA,SD57012
|
NONE |
GOV |
USE OF THE TENNIS COURTS HAS DWINDLED OVER THE YEARS AS THE SPORT HAS FADED IN POPULARITY AMONG CANISTOTA RESIDENTS. THE COURTS ARE MORE FREQUENTLY USED BY THE CANISTOTA PICKLEBALL GROUP AND OTHER CAUSAL PICKLEBALL USERS. THE CONCRETE BASE OF THE COURTS IS IN DISREPAIR AND NEEDS ATTENTION. THE CITY HAD STARTED DISCUSSIONS ON WHAT NEEDED TO BE DONE TO THE COURTS TO ENSURE THEIR CONTINUED VIABILITY. AFTER BEING APPROACHED BY PICKLEBALL ENTHUSIASTS IN THE COMMUNITY, THE CITY COUNCIL RESOLVED TO REPLACE THE EXISTING TENNIS COURTS WITH NEW PICKLEBALL COURTS. THE NEW COURTS WILL INCLUDE A NEW BASE WITH GAME LINES, PICKLEBALL NETS AND GROUND SLEEVES, FENCING AND LIGHTING. |
20,873 |
CITY OF CEDAR RAPIDS PARKS AND REC DEPT 500 15TH AVENUE SW CEDAR RAPIDS,IA52404
|
NONE |
GOV |
BEVER PARK, LOCATED IN THE SOUTHEAST QUADRANT OF CEDAR RAPIDS, IS A 91-ACRE PARK FEATURING OLD MACDONALD'S FARM, PAVILIONS, FLOWER GARDENS, A PRACTICE FIELD, TENNIS COURT, PLAYGROUND AND POOL. THE PARKS AND RECREATION DEPARTMENT CONTINUALLY AIMS TO MEET THE NEEDS OF THE COMMUNITY AND HAS TARGETED BEVER PARK FOR NEW PLAYGROUND EQUIPMENT. THE PROJECT WILL UPDATE THE CURRENT TWENTY-YEAR OLD EQUIPMENT IN THIS HIGHLY ACTIVE-USE PARK. PLANNED UPDATES INCLUDE A SEPARATE PLAY STRUCTURE FOR CHILDREN AGES TWO TO FIVE AND ANOTHER STRUCTURE GEARED TOWARDS KIDS AGES FIVE TO TWELVE. MULTIPLE PLAY STRUCTURES THAT CATER TO AGE GROUPS ALLOWS THE PLAY ENVIRONMENT TO HAVE SPECIFIC PLAY AREAS BASED ON AGE AND ABILITY. STAND-ALONE PLAY EQUIPMENT WILL ALSO BE PART OF THE PROJECT, INCLUDING SEE-SAWS, CLIMBERS AND/OR MUSICAL FEATURES. A VARIETY OF SWING TYPES WILL BE INSTALLED AND RUBBER SAFETY TILES WILL BE UTILIZED AT THE MAIN ACCESS POINTS TO THE TWO PLAY STRUCTURES. |
25,000 |
CITY OF CHAMBERLAIN 715 N MAIN STREET CHAMBERLAIN,SD57325
|
NONE |
GOV |
THE CITY WOULD LIKE TO ADD INTERACTIVE AND EDUCATIONAL PARK EQUIPMENT TO AN EXISTING DINOSAUR PARK. CURRENTLY, THERE IS ONE LIFELIKE REPLICA OF A MOSASAUR IN THIS PARK, WHICH IS FOR VIEWING ONLY. ALTHOUGH, CHILDREN FIND VISITING THE MOSASAUR ENTERTAINING, YOUNG CHILDREN TRULY LEARN THROUGH THE ACT OF PLAYING. WE WOULD LIKE TO ADD A DINOSAUR FOSSIL PLAYGROUND TO THE LARGE GREEN PARK ADJACENT TO THE LOCATION OF THE ONE MOSASAUR. THIS WOULD ALLOW CHILDREN TO PRACTICE THEIR BALANCE, HOP, JUMP, RUN AND PLAY WITH THE INTERACTIVE EQUIPMENT, WHILE LEARNING ABOUT THE HISTORY BEHIND THE MONSTROUS BONES AND PREHISTORIC CREATURES. THIS PARK IS NEXT TO A CHILDREN'S T-BALL FIELD AND THE CITY SWIMMING POOL. IT IS LOCATED ON MAIN STREET IN THE CENTRAL PART OF TOWN, OFFERING A PLACE ACCESSIBLE TO ALL AND EXPANDING UPON THE OPTIONS OF PLAY. |
25,000 |
CITY OF CHARITON 115 S MAIN ST CHARITON,IA52761
|
NONE |
GOV |
THE CHARITON SPLASH PAD WAS STARTED WITH THE IDEA OF WHAT DOES CHARITON NEED BY OUR YOUTH LEADERSHIP GROUP SPLASH (A YOUTH LEADERSHIP ORGANIZATION THAT IS COMPRISED OF MIDDLE AND HIGH SCHOOL AGE STUDENTS IN THE CHARITON COMMUNITY SCHOOL DISTRICT). THE DESIGN IS THEMED WITH THE CHARITON WATER TOWER AND OLD BETSY, CHARITON'S FIRST FIRE TRUCK. WHILE THE DESIGN SHARES CHARITON'S COMMUNITY PRIDE AND HISTORY, IT ALSO WILL MEET A NEED THAT THE CITY IS WORKING DILIGENTLY ON PROVIDING MORE ADA ACCESSIBLE RECREATIONAL ACTIVITIES IN OUR COMMUNITY. WE KNOW THAT NOT ALL CHILDREN OR ADULTS CAN ENJOY THE CURRENT AQUATIC CENTER'S FEATURES DUE TO EITHER PHYSICAL OR MENTAL DISABILITIES. THE SPLASH PAD WILL BE WHEELCHAIR ACCESSIBLE. THE SPLASH PAD WILL BE ADJACENT TO THE AQUATIC CENTER, BUT OPEN NUMEROUS HOURS THROUGHOUT THE DAY AND EVENING FOR USE. |
100,000 |
CITY OF CRESTON 116 W ADAMS STREET PO BOX 449 CRESTON,IA50801
|
NONE |
GOV |
MPAC IS THE RENOVATION AND EXPANSION OF THE CRESTON POOL, WHICH WILL OFFER NEW FEATURES INCLUDING ZERO DEPTH ENTRY, WALKING CHANNEL, SLIDES DESIGNED FOR ALL AGES, CLIMBING WALL AND INCLUSIVE PLAY AREA. THE DESIGN IS FOCUSED ON EASE OF ACCESS FOR SWIMMERS OF ALL AGES AND ABILITIES, THUS PROVIDING MORE OPPORTUNITY FOR ACTIVITY FOR THE ENTIRE COMMUNITY. THE PROJECT, ORIGINALLY COSTING $4.4 MILLION IN CONSTRUCTION COSTS AND WITH A $1 MILLION ENDOWMENT, HAS BEEN DIVIDED INTO TWO PROJECTS. PHASE 1 WILL INCLUDE THE INCLUSIVE PLAY AREA, TODDLER SLIDE, IMPROVEMENTS TO THE POOL BOWL TO MAKE IT ZERO-DEPTH ENTRY, AS WELL AS IMPROVEMENTS TO THE EXISTING MECHANICAL SYSTEM, INCLUDING A WATER HEATER TO MAKE THE POOL MORE USABLE IN EARLY SUMMER. |
100,000 |
CITY OF DALLAS CENTER 1502 WALNUT ST PO BOX 396 DALLAS CENTER,IA50063
|
NONE |
GOV |
THE ACCESSIBLE PATHWAYS PROJECT REPLACES AN UNEVEN 1.2 MILE DIRT WALKING PATH WITH AN ADA COMPLIANT 8 FT WIDE CONCRETE TRAIL AROUND THE PERIMETER OF THE BURNETT RECREATIONAL COMPLEX. PHASE 1 OF THIS PROJECT CONNECTED THE BALLFIELDS, BLEACHERS, CONCESSIONS, AND PARKING LOT AND WAS COMPLETED IN OCT OF 2020. PHASE 2 WILL CONNECT THE EXISTING SIDEWALK TO THE SCHOOL SIDEWALK INFRASTRUCTURE. THE REC COMPLEX IS HOME TO THE CITY'S BASEBALL, SOFTBALL, AND SOCCER FIELDS AND USED BY LOCAL ORGANIZATIONS AND DALLAS CENTER-GRIMES COMMUNITY SCHOOL DISTRICT. THE BURNETT WALKING PATH ALSO PROVIDES A SAFE RECREATIONAL SPACE FOR EXTRACURRICULAR CLUBS AT THE ELEMENTARY AND MIDDLE SCHOOLS, AS WELL AS FOR RESIDENTS AND STAFF OF DALLAS CENTER'S OLDER ADULT RETIREMENT COMMUNITY AND SKILLED NURSING FACILITY. THIS TRAIL ENHANCEMENT WOULD ASSURE THAT RESIDENTS OF ALL AGES AND ABILITIES HAVE A SPACE TO BE PHYSICALLY ACTIVE NEAR THEIR HOME, SCHOOL, OR WORKPLACE. |
23,027 |
CITY OF DEWITT 900 14TH STREET DEWITT,IA52742
|
NONE |
GOV |
THE DEWITT PICKLEBALL CLUB IS UNDERTAKING A PROJECT TO CONSTRUCT SIX OUTDOOR PUBLIC PICKLEBALL COURTS ON A PARCEL OF LAND CURRENTLY OWNED BY THE CITY OF DEWITT, IOWA. THIS PROJECT WILL INCLUDE ENGINEERING AND LAND PREPARATION, CONCRETE COURT DECKING WITH ACRYLIC SURFACING, GATES, FENCING WITH WINDSCREENS, LIGHTING FOR EVENING PLAY AND SECURITY, AND BENCHES. A PARKING LOT TO ACCOMMODATE 24 VEHICLES WILL BE DEVELOPED FOR PLAYERS AND VISITORS. |
25,000 |
CITY OF EPWORTH 191 JACOBY DR E EPWORTH,IA52045
|
NONE |
GOV |
OUR SPLASH PAD PROJECT IS A ZERO DEPTH AQUATIC PLAY AREA THAT ENCOURAGES PHYSICAL, FUNCTIONAL AND SOCIAL DEVELOPMENT, GIVES HOURS OF ENDLESS FUN, ENCOURAGES TEAM AND INTERACTIVE PLAY, STIMULATES AND CHALLENGES ALL AGES AND ABILITIES. THIS PROJECT IS A RECREATIONAL AMENITY THAT WILL SERVE EPWORTH AND THE SURROUNDING COMMUNITY WITH DESIGN ELEMENTS FOR TODDLERS, TEENS, & FAMILY. THE PROPOSED LAYOUT SPANS 4,387 SQUARE FEET AND THE SELECTED FEATURES AND RELATED APPURTENANCES BRING THE PROJECT TO A COST OF $380,000. WITH THE RECENT RISE IN PRICING, THE CITY DESIRES TO PURCHASE THE PLAY FEATURES IN 2021 AND PLAN FOR AN EARLY SPRING 2022 INSTALLATION. THE FACILITY WILL BE LOCATED WITHIN OUR MUNICIPAL PARK NEXT TO OUR INCLUSIVE PLAYGROUND. THE FACILITY IS DESIGNED TO INCORPORATE INTERACTIVE PLAY, INCLUSIVE PLAY AND INTUITIVE PLAY, IS ACCESSIBLE FOR ALL AGES AND ABILITIES. IT ALSO OFFERS A TACTILE EXPERIENCE, SENSORY-RICH PLAY, AND ENCOURAGES TEAM PLAY. |
25,000 |
CITY OF FARLEY 206 1ST ST N FARLEY,IA52046
|
NONE |
GOV |
THE PROJECT INVOLVES THE ADDITION OF THREE NEW SPORTS COURTS, ONE FOR TENNIS/PICKLEBALL, BASKETBALL AND SAND VOLLEYBALL. THESE COURT IMPROVEMENTS INCLUDE NEW COURTS, AREA LIGHTING, BENCHES, AND AN ADA-ACCESSIBLE CONCRETE SIDEWALK ADJACENT TO THE COURTS. THE EXPANSION WILL BRING MORE PEOPLE SEEKING PHYSICAL ACTIVITY TO THE PARK AND THE ADDITION OF NEW COURTS WITH LIGHTING AND ACCESSIBILITY WILL MAKE THEM SAFE AND ATTRACTIVE TO MANY MORE PEOPLE OF ALL AGES AND ABILITIES. IN ADDITION TO THE NEW COURTS, THE FULL LEGACY PROJECT INCLUDES: THE ADDITION OF A SECOND ENCLOSED PAVILION; INSTALLATION OF A 4,000 SQUARE-FOOT SPLASH PAD; ACQUISITION OF LAND FOR A NEW WALKING TRAIL AROUND THE PARK; A RETENTION POND FOR BETTER DRAINAGE AND A NEW ROAD TO PREVENT FLOODING; MORE DESIGNATED PARKING; ADDITIONAL LIGHTING; AND SIDEWALKS THAT LEAD TO AMENITIES, WITH ADA ACCESSIBILITY THROUGHOUT THE PARK. |
100,000 |
CITY OF HILLS PO BOX 345 HILLS,IA52235
|
NONE |
GOV |
THE CITY OF HILLS RESPECTFULLY REQUESTS FUNDING TO CONSTRUCT PHASE III OF HILLS MEADOWS PARK. PHASE I AND II ARE COMPLETE AND INCLUDE A SPLASH PAD, AN EQUIPMENT BUILDING, A PRIVACY FENCE, A COVERED SHELTER, TWO PICNIC TABLES, AND TRASH AND RECYCLE BINS. PHASE III OF THE HILLS MEADOWS PARK IS PROPOSED TO INCLUDE THE FOLLOWING IMPROVEMENTS; INSTALLATION OF SHADE TREES AND PARK BENCHES; ESTABLISHMENT OF A FORMAL COMMUNITY POLLINATOR GARDEN; CONSTRUCTION OF AN INCLUSIVE PLAYGROUND FOR CHILDREN OF ALL AGES AND PHYSICAL ABILITIES; AND FINALLY, AN ADULT EXERCISE EQUIPMENT SYSTEM GEARED TOWARD TEENS AND ADULTS. |
25,000 |
CITY OF KEOTA 225 E BROADWAY AVE PO BOX 77 KEOTA,IA52248
|
NONE |
GOV |
THE OLD POOL IS TO BE DEMOLISHED AND THEN REPLACED WITH AN L SHAPED POOL THAT IS SLIGHTLY LARGER WITH A DESCENDING STEP ENTRY TO ACCOMMODATE THE HANDICAPPED AND SMALL CHILDREN. IT WILL BE HEATED TO PROVIDE EXTENDED USE AND A CHAIR LIFT WILL BE ADDED TO PROVIDE HANDICAPPED ENTRY. THE CURRENT BATHHOUSE WILL BE RENOVATED TO MEET OSHA AND ADA STANDARDS. PHASE 2 OF THE PLAN CONSISTS OF ADDING A SPLASH PAD AT THE POOL SITE FOR SMALL CHILDREN IF FINANCING WILL ALLOW. THIS POOL DESIGN WILL MEET THE NEEDS OF ALL PARTICIPANTS REGARDLESS OF AGE OR SKILLS AND CONFORMS TO ALL OSHA AND ADA REQUIREMENTS. ONCE THE POOL IS CONSTRUCTED, THE CITY WILL THEN ASSUME RESPONSIBILITY FOR THE OPERATING EXPENSES AND POOL MANAGEMENT AS THEY HAVE IN THE PAST WITHOUT DIFFICULTY. |
25,000 |
CITY OF LANSING PO BOX 307 LANSING,IA52151
|
NONE |
GOV |
THIS PROJECT WILL ADDRESS CONCERNS AT MOUNT HOSMER AS FOLLOWS: ENGAGE PARTNERS BY FORMING AND FACILITATING QUARTERLY MEETINGS TO PROVIDE INPUT ON PROJECT DELIVERABLES. COMPLETE A GPS TRAIL & RESOURCE INVENTORY TO IDENTIFY SAFETY CONCERNS, POINTS OF INTEREST, TRAIL CONDITIONS, AND FINALIZE AN UP-TO-DATE GIS TRAIL DATABASE NEEDED TO CREATE A MASTER PLAN FOR THE LPS. DEVELOP A WAYFINDING SIGNAGE MASTER PLAN TO ESTABLISH LPS BRAND DESIGN STANDARDS AS WELL AS THE IDENTIFICATION, DIMENSIONS, AND LOCATIONS OF SIGNAGE TYPES NEEDED. THIS WILL INCLUDE DESIGNATING SPECIFIC ROUTES WITHIN THE LPS TO BE SIGNED WITH COLOR-CODED BLAZERS ONTO THE TOPS OF SELECT TRAIL POSTS. A LOOPED TRAIL ALLOWS A USER TO END UP WHERE THEY STARTED WITH EITHER MINIMAL OR NO REPEATING PARTS OF THE TRAIL. DESIGN AND FABRICATE THREE TRAILHEAD KIOSKS TO WELCOME VISITORS AND PROVIDE THEM WITH INFORMATION THAT MAY BE ESSENTIAL TO THEIR SAFETY AND ENJOYMENT OF THE LPS. |
25,000 |
CITY OF MADRID 304 S WATER ST MADRID,IA50156
|
NONE |
GOV |
MADRID IS LOOKING TO EXPAND OUR PARK SERVICES TO INCLUDE A DEDICATED TODDLER PLAY AREA. WE ARE GOING TO PURCHASE TWO PIECES OF EQUIPMENT THAT MEET ADA GUIDELINES AS WELL AS THE PROFESSIONAL INSTALLATION OF THIS EQUIPMENT. THIS PLAYSET PROMOTES LANGUAGE AND COUNTING SKILL DEVELOPMENT WITH ANIMALS, SHAPES, AND THE ALPHABET INCORPORATED INTO IT. IT PROVIDES A STRAIGHT SLIDE, PLAY RAMP, WINDOW PANEL, RAIN WHEEL, AND BONGO DRUMS. THE SECOND PIECE OF EQUIPMENT IS THE KNOXVILLE PLAYGROUND. THIS IS DESIGNED TO ACCOMMODATE AGES 23 MONTHS AND UP. THIS SET INCLUDES SEVERAL ACTIVITIES INCLUDING A DRUM PANEL, BENCH PANEL, AND AN IMAGINATIVE ZONE THAT INCLUDES A STORE WINDOW AND CAR PANEL. ADDITIONALLY, THIS INCLUDES AN INCLINE CRAWL TUBE, PIRATES SHIP WHEEL, GEAR PANEL, AND A TIC TAC TOE PANEL. |
10,000 |
CITY OF MANSON PO BOX 430 MANSON,IA50563
|
NONE |
GOV |
THE MANSON YOUTH SPORTS COMPLEX PROJECT CONSISTS OF RELOCATING TWO BASEBALL FIELDS AND TWO SOCCER FIELDS TO A SPACE ADJACENT TO THE MANSON AREA COMMUNITY CENTER. UPON COMPLETION OF THE PROJECT, THIS SPACE WILL BE THE NEW MANSON YOUTH SPORTS COMPLEX AND WILL PROVIDE A DEDICATED SPACE FOR YOUTH TO RECREATE IN MANSON. DETAILS OF THE PROJECT INCLUDE THE REMOVAL OF ASPHALT AND THE CLEARING OF TREES THAT WILL BE COMPLETED BY THE CITY OF MANSON, AND THE GRADING OF THE ENTIRE SITE, CUTTING OUT INFIELDS FOR LIMESTONE AND PLACING SAND AND LIMESTONE THAT WILL BE COMPLETED BY LOCAL CONSTRUCTION COMPANY, RASCH CONSTRUCTION. FINAL STEPS INCLUDE COMPLETE FENCING OF ONE OF THE BASEBALL FIELDS, SEEDING AND LANDSCAPING. BLEACHERS AND CONCESSION STANDS WILL BE RELOCATED TO THE NEW SPORTS COMPLEX FROM THEIR CURRENT LOCATION. BOTH SOCCER AND BASEBALL FIELDS WILL BE READY FOR USE IN THE SPRING OF 2022. |
25,000 |
CITY OF MASON CITY 10 1ST STREET NW MASON CITY,IA50401
|
|
GOV |
WILLOW CREEK IS AN OVERLOOKED NATURAL GATEWAY INTO THE HEART OF MASON CITY. THIS CORRIDOR PROVIDES A CONNECTION BETWEEN ART, CULTURAL, ENTERTAINMENT AND RECREATIONAL FEATURES IN THE CITY. THE GOAL OF THIS PROJECT IS TO CREATE FUNCTIONAL, INVITING SPACES ALONG WILLOW CREEK BETWEEN S DELAWARE AVE/US HIGHWAY 65 AND 2ND STREET SW INCORPORATING AND HIGHLIGHTING THE NATURAL ENVIRONMENT. MASON CITY'S GOAL FOR THE WILLOW CREEK AREA IS TO HIGHLIGHT THE NATURAL GATEWAY AND CREATE AN ACCESSIBLE OUTDOOR PUBLIC SPACE THAT CONNECTS RESIDENTS AND VISITORS TO THE EXPANDING AMENITIES DOWNTOWN. THE WILLOW CREEK RIVERWALK PROJECT WILL PROMOTE CURRENT AND FUTURE DOWNTOWN REVITALIZATION EFFORTS. IT IS ADJACENT TO THE NEW MULTI-PURPOSE ARENA, THE NEWLY OPENED RIVER HOUSING DEVELOPMENT, AND SOON-TO-BE-CONSTRUCTED HOTEL, CONVENTION CENTER AND PERFORMING ARTS PAVILION. THIS PROJECT IS ALSO LOCATED WITHIN THE ONE-OF-A-KIND DOWNTOWN MASON CITY CULTURAL AND ENTERTAINMENT DISTRICT. |
25,000 |
CITY OF PIERRE 2301 PATRON PARKWAY PIERRE,SD57501
|
NONE |
GOV |
THIS PROJECT WILL REPLACE THE CITY'S ONLY PUBLIC OUTDOOR POOL WITH A MODERN FAMILY-FRIENDLY POOL THAT PROVIDES RECREATION, FITNESS, SOCIAL AND EDUCATIONAL OPPORTUNITIES. THE REPLACEMENT INCLUDES A 50-METER MULTI-PURPOSE POOL, A RECREATIONAL POOL, AND A LAZY RIVER, AS WELL AS A VARIETY OF WATER FEATURES LIKE SLIDES, A DIVING TOWER, A WATER WALK, A CHILDREN'S WATER PLATFORM, SHADE STRUCTURES, AND ZERO DEPTH ENTRY. THE CITY OF PIERRE HAS COMMITTED $10 MILLION FOR THIS SWIMMING POOL. THE CITY HAS COMMISSIONED THE PIERRE POOL COMMITTEE TO RAISE $3 MILLION TO PAY FOR ADDITIONAL FEATURES. THE ADDITIONAL MONEY WILL ENSURE THAT THE SWIMMING POOL WILL HAVE 50 METER SWIM LANES, LAZY RIVER FOR LOW RESISTANCE EXERCISES, A 3 METER DIVING BOARD, WATER SLIDES, AND PLAY FEATURES THAT WILL NOT ONLY BRING FAMILIES TO THE POOL FOR A DAY OF FUN AND EXERCISE, BUT WILL PROVIDE WELLNESS OPPORTUNITIES TO PEOPLE OF ALL AGES, INCLUDING THOSE WITH INJURIES, DISABILITIES AND MEDICAL CONDITIONS. |
100,000 |
CITY OF POCAHONTAS 23 W ELM AVE PO BOX 69 POCAHONTAS,IA50574
|
NONE |
GOV |
IT WAS DETERMINED FROM A COMMUNITY SURVEY THAT THERE WAS A STRONG DESIRE FROM LOCAL RESIDENTS TO ADD NEW AMENITIES TO THE PARK, INCLUDING A WALKING TRAIL THAT CONNECTS ELBERT PARK TO OTHERS PARKS IN THE COMMUNITY, AND TO IMPROVE ACCESS AND CONNECTION TO THE EXISTING AMENITIES IN THE PARK, SUCH AS THE PLAYGROUND EQUIPMENT, A SAND VOLLEYBALL COURT, AND MULTIPLE BASEBALL, SOFTBALL AND SOCCER FIELDS. WE BELIEVE THAT BY FIRST CONNECTING THE AMENITIES AT THE PARK, WE CAN REALLY RALLY THE COMMUNITY AND GENERATE A BIGGER EXCITEMENT TO MAKE THE LARGER TRAIL PORTION HAPPEN AT A QUICKER PACE, ALL THE WHILE ENCOURAGING A SAFE, ACCESSIBLE, AND INCLUSIVE ENVIRONMENT TO BE PHYSICALLY ACTIVE IN. OUR GRANT REQUEST IS TO HELP FUND THE COMMUNITY TRAIL MASTER PLAN AND THE INSTALLATION OF THE SIDEWALKS/TRAIL EXTENSIONS IN ELBERT PARK WHICH WILL PROVIDE ADA ACCESSIBLE CONNECTIONS TO THE COMMUNITY TRAIL SYSTEM. |
25,000 |
CITY OF POLK CITY 112 S 3RD ST PO BOX 426 POLK CITY,IA50226
|
NONE |
GOV |
THE CITY OF POLK CITY IS PLANNING TO CONSTRUCT PHASE II OF THE LOST LAKES PARK DEVELOPMENT PROJECT. THIS PHASE WILL BE THE FINAL PHASE OF THE PROJECT. THE PROJECT PHASE HAS A TOTAL BUDGET OF $203,325 AND CONSISTS OF INSTALLATION OF PLAYGROUND EQUIPMENT, SAFETY SURFACING, LANDSCAPING, AND A SIDEWALK CONNECTION TO AN ADJACENT NEIGHBORHOOD. PHASE I OF THE PROJECT IS COMPLETE AND CONSISTED OF GRADING, WATER MAIN EXTENSION, ELECTRICAL EXTENSION, PCC PAVEMENT, STORM SEWER, AND A PORTABLE RESTROOM ENCLOSURE. THE COST OF PHASE I OF THE PARK PROJECT WAS APPROXIMATELY $120,000. |
25,000 |
CITY OF PRESTON PO BOX 37 PRESTON,IA52069
|
NONE |
GOV |
THE PROPOSED PROJECT INCLUDES A FITCORE (R) COURSE (AGILITY/STRENGTH/ENDURANCE/OVERALL FITNESS BUILDING COURSE) THAT WILL BE A 2-3 COMMUNITY BUILD PROJECT. THE COURSE WILL INCLUDE 15 PIECES OF EQUIPMENT THAT PROMOTE STRENGTH AND AGILITY TO BE CONSTRUCTED IN PRESTON'S WESTSIDE PARK WHICH IS LOCATED 2 BLOCKS FROM EASTON VALLEY COMMUNITY SCHOOL DISTRICT'S JUNIOR / SENIOR HIGH. |
25,000 |
CITY OF SHELDON PO BOX 276 SHELDON,IA51201
|
NONE |
GOV |
THE PROPOSED PROJECT WILL CREATE A ONE-MILE LOOP AROUND THE CROSSROADS PARK LAKE AND ADD ONE-MILE TO THE EXISTING SHELDON RECREATIONAL TRAIL SYSTEM. THE PROPOSED TRAIL WILL BE 10-FOOT WIDE, UTILIZING THE CURRENT STATE OF IOWA STANDARDS FOR A RECREATIONAL MULTI-USE TRAIL AND WILL BE CONSTRUCTED OF CONCRETE FOR LONG TERM USE AND DURABILITY. CROSSROADS PARK TRAIL WILL LOOP THE EXISTING CROSSROADS PARK LAKE, TYING INTO THE CROSSROADS PAVILION EVENTS CENTER. THE CITY LOOKS TO ENHANCE THE TRAIL AND CROSSROADS PARK WITH BENCHES, PICNIC TABLES, OVERLOOK AREAS, FISHING PIER AND A PLAYGROUND IN THE NEXT FEW YEARS. ONCE CONSTRUCTED THE TRAIL WILL BE AVAILABLE FOR RESIDENTS AS WELL AS VISITORS AND GROUPS UTILIZING THE EVENTS CENTER. THE PROPOSED PROJECT WILL TIE IN TO THE EXISTING 6.23 MILES OF THE SHELDON RECREATIONAL TRAIL WHICH INCORPORATES RESIDENTIAL NEIGHBORHOODS, SCHOOLS, PARKS, AND NORTHWEST IOWA COMMUNITY COLLEGE TOGETHER VIA A PEDESTRIAN AND BICYCLE SAFE TRANSPORTATION SYSTEM. |
100,000 |
CITY OF SLOAN 428 EVANS ST SLOAN,IA51055
|
NONE |
GOV |
THIS PROJECT IS TO START A MUCH NEEDED TRAIL SYSTEM THROUGHOUT OUR COMMUNITY. THROUGH COMMUNITY INPUT, CITY STAFF AND COUNCIL INPUT, IT WAS DETERMINED THAT THE COMMUNITY DESIRED AN UPDATED CITY PARK AND ADA COMPLIANT WALKING TRAILS TO CONNECT ALL AREAS OF THE CITY. CURRENTLY, THE CITY LACKS ACCESSIBILITY TO WHEELCHAIR USERS AND OTHER PHYSICALLY CHALLENGED RESIDENTS WITH THE CURRENT SIDEWALK SYSTEM, SO THIS TRAIL SYSTEM IS A HIGH PRIORITY, AND STARTING AT THE PARK WAS DETERMINED TO BE HAVE THE MOST IMPACT, AS IT IS DIFFICULT FOR ANYONE WITH DISABILITIES TO WALK THROUGH THE PARK DUE TO VERY UNEVEN GROUND. SLOAN ALSO IS A VERY ACTIVE WALKING COMMUNITY. THE TRAIL HEAD WILL BE AN EIGHT FOOT WIDE CONCRETE PATH AROUND THE PERIMETER OF THE PARK ON ALL FOUR SIDES, WITH CURB CUTS AT BOTH ENDS OF EACH SIDE OF THE PARK, FOR A TOTAL OF 8 CURB CUTS, TO ALLOW WHEELCHAIR ACCESS TO FUTURE TRAIL EXTENSIONS IN ALL DIRECTIONS. |
25,000 |
CITY OF ST CHARLES 113 S LUMBER ST ST CHARLES,IA50240
|
NONE |
GOV |
WE WOULD LIKE TO REPLACE OUR EXISTING BASKETBALL COURT SURFACE AREA AND ADD A PICKLEBALL COURT AT THE SOUTH END OF THIS SURFACED AREA THAT IS CURRENTLY AN OPEN AREA. THE PICKLEBALL COURT WILL HAVE 8' OF FENCING AROUND IT. ADDING AN ACRYLIC COLOR-COATING AND LINES WILL GIVE THE COURTS A WOW FACTOR, AND HAS BEEN FOUND TO INCREASE AND HELP ENCOURAGE THE USAGE OF THESE COURTS. THE COLOR IS EXPECTED TO LAST 10+ YEARS. |
25,000 |
CITY OF STANTON PO BOX 189 STANTON,IA51573
|
NONE |
GOV |
THE TOTAL PROPOSED GREENBELT TRAIL AROUND THE CITY EQUATES TO APPROXIMATELY 3.1 MILES, OF WHICH 1.812 MILES HAS BEEN COMPLETED AROUND THE WEST SIDE OF THE CITY. THE REMAINING 1.288 MILES THAT NEEDS TO BE CONSTRUCTED ON THE EAST SIDE HAS BEEN BROKEN INTO TWO PHASES. PHASE ONE CONSISTS OF APPROXIMATELY 1.013 MILES. THE CITY ALREADY ACQUIRED THE LAND FOR PHASE ONE, AND THE PROPERTY HAS BEEN SURVEYED AND CLEARED. STANTON IS REQUESTING FUNDS TO CONSTRUCT PHASE ONE OF THIS TRAIL ON THE EASTERN SIDE OF THE CITY THAT WILL CONNECT THE STANTON CHILD RESOURCE CENTER WITH THE SOUTHEASTERN SIDE OF TOWN AT FRANKFORT STREET/225TH STREET. |
100,000 |
CITY OF TIPTON 407 LYNN STREET TIPTON,IA52772
|
NONE |
GOV |
THE PROPOSED PROJECT IS PART OF THE DOWNTOWN REVITALIZATION PROJECT STARTED BY THE CITY OF TIPTON IN 2008. THE DESIGN CONCEPT INCLUDES A SPLASHPAD, WALKWAY, SHADE STRUCTURE, BENCHES AND FOOD COURT LOCATION. WITH THE DEVELOPMENT PLANS IN PLACE FOR THE U.S. HIGHWAY 38 DEVELOPMENT WITH THE IOWA DOT THROUGH THE DOWNTOWN AREA THE NEW POCKET PARK WILL CONNECT TO THAT TRAIL SYSTEM PROVIDING A GREAT LOCATION FOR RECREATION AND RELAXATION FOR THE PUBLIC UTILIZING THE TRAIL SYSTEM THROUGH TIPTON. THE 4TH STREET PLAZA POCKET PARK WILL BE A GREAT ASSET TO THE COMMUNITY AND PROVIDE A WONDERFUL GATHERING LOCATION AND POTENTIAL DESTINATION FOR THE COMMUNITY TO UTILIZE A RECREATIONAL SPACE IN THE COMMUNITY THAT CURRENTLY IS NOT BEING UTILIZED. |
25,000 |
CITY OF WEST UNION PO BOX 151 WEST UNION,IA52175
|
NONE |
GOV |
THE GATEWAY TO RECREATION: WEST UNION TO ECHO VALLEY STATE PARK TRAIL WILL CONSTRUCT A NEW 1.85 MILE TRAIL CONNECTING THE CITY OF WEST UNION, IOWA AND ECHO VALLEY STATE PARK. THIS CONNECTION THEN UNITES TO AN ALREADY EXISTING TRAIL NETWORK WITHIN THE PARK OF OVER 3 MILES. THE STATE PARK TRAILS ARE HEAVILY UTILIZED, BUT REQUIRE USERS TO DRIVE FROM THE CITY TO SAFELY ACCESS THEM. THIS NEW TRAIL WILL EXPAND THE ROUTE TO A TOTAL OF OVER FOUR MILES AND ELIMINATE THE NEED TO DRIVE TO THE PARK, HENCE EXPANDING THE EXPERIENCE AND HEALTH AND WELFARE OF THE ENTHUSIAST. THE PROJECT WILL AMALGAMATE THIS BEAUTIFUL AND PROGRESSIVE COMMUNITY WITH ITS RENOWNED GREEN STREETSCAPE AND ITS HEALTH AND WALKABILITY INITIATIVES TO A STATE PARK, WHICH TEEMS WITH NATURAL BEAUTY AND PRISTINE COLD WATER TROUT STREAMS. |
100,000 |
CITY OF WILLOW LAKE PO BOX 317 WILLOW LAKE,SD57278
|
NONE |
GOV |
WILLOW LAKE, SOUTH DAKOTA IS PROUD OF ITS CITY PARK, RECENTLY RENAMED VETERANS MEMORIAL PARK FOR THE STATELY VETERANS MEMORIAL IN THE CENTER, WHICH WAS ENTIRELY CREATED BY WILLOW LAKE RESIDENTS IN HONOR OF OUR LOCAL MILITARY VETERANS. WE ALSO RECOGNIZE THAT, DESPITE BEING WELL-MAINTAINED, MUCH OF THE PLAYGROUND EQUIPMENT IN THIS PARK HAS COME TO THE END OF ITS USEFUL LIFE. THROUGH INPUT FROM LOCAL FAMILIES WHO FREQUENT THE PARK, AS WELL AS GUIDANCE FROM OUR INSURANCE PROVIDER, WE ALSO DESIRE TO IMPROVE THE SAFETY FEATURES OF THIS PLAYGROUND AND MAKE IT ADA-COMPLIANT. OUR PATRIOTIC PLAY PROJECT WILL REPLACE OLD PLAYGROUND EQUIPMENT WITH NEW, COMMERCIAL-GRADE METAL PLAYGROUND EQUIPMENT THAT IS DESIGNED FOR SAFETY, ACCESSIBILITY, DURABILITY, AND EASE OF MAINTENANCE. FLEX FIBER ENGINEERED WOOD FIBER MULCH WILL BE ADDED UNDERNEATH ALL NEW PLAYGROUND EQUIPMENT, CREATING A SOFT SURFACE THAT WILL VASTLY IMPROVE THE CHILDREN'S SAFETY. |
25,000 |
CLARK COUNTY PO BOX 295 CLARK,SD57225
|
NONE |
GOV |
THE NEW CLARK COUNTY ACTIVITY CENTER IS A DREAM BEING BROUGHT TO LIFE BY CLARK COUNTY AND THE CLARK COUNTY 4-H LEADERS ASSOCIATION. THIS NEW BUILDING WILL SERVE THE YOUTH AND FAMILIES IN THE COUNTY'S 4-H PROGRAM AND YOUTH AND ADULTS FROM ACROSS THE ENTIRE COMMUNITY. IT WILL BE AN ACCESSIBLE, SAFE LOCATION FOR PEOPLE OF ALL AGES TO PARTICIPATE IN HEALTHY ACTIVITIES. SHOOTING SPORTS ARE AMONG THE MOST POPULAR ACTIVITIES AND THIS FACILITY WILL BE AN IDEAL LOCATION FOR THIS PROGRAM TO CONTINUE TO GROW. THE NEED IS CLEAR IN OUR GROWING COMMUNITY FOR A NEW, LARGE SPACE FOR YOUTH WRESTLING, GYMNASTICS, DANCE, BASKETBALL, AND TAEKWONDO. EACH OF THESE ACTIVITIES IS CURRENTLY OFFERED IN CLARK, BUT EACH HAS RUN OUT OF SPACE OR IS FORCED TO OPERATE IN A SPACE THAT IS TOO SMALL TO BE SAFE. THE BUILDING IS DESIGNED WITH A WALKING TRACK AROUND ITS INDOOR PERIMETER, PROVIDING A SAFE, NONSLIP SURFACE FOR THOSE WHO WANT TO WALK INDOORS FOR EXERCISE. |
25,000 |
DES MOINES AREA MPO 420 WATSON POWELL JR WAY SUITE 205 DES MOINES,IA50309
|
NONE |
GOV |
CENTRAL IOWA IS HOME TO 600 PLUS MILES OF TRAILS THAT CONNECT COMMUNITIES, PARKS, WORKPLACES AND SCHOOLS AND PROVIDE AN EXCELLENT ALTERNATIVE TO DRIVING IN THE REGION. THE MPO LOANS OUT SHORT-TERM TRAIL COUNTERS TO COMMUNITIES. HOWEVER, WITHOUT PERMANENT TRAIL COUNTING HARDWARE, IT IS HARD TO HAVE A REAL SENSE OF THE IMPACT OF OUR TAIL SYSTEM AND THE NECESSARY ATTENTION AND INVESTMENT IT MIGHT NEED IN THE FUTURE TO ENSURE THIS AMENITY CONTINUES TO BE PRIORITIZED, EXPANDED AND MAINTAINED. THE MPO'S PERMANENT TRAIL COUNTER PROGRAM WILL ESTABLISH AT LEAST ONE PERMANENT MULTI-USE TRAIL COUNTER IN EACH OF THE EIGHT PRIMARY LEVEL 1 TRAIL CORRIDORS IN THE REGION WHICH HISTORICALLY EXPERIENCE HEAVY USAGE, WITH THE OPTION TO EXPAND IF NEEDED. THE MULTI COUNTERS WILL TAKE COUNTS AROUND THE CLOCK, ALL YEAR ROUND, UNDER ALL WEATHER CONDITIONS AND WILL REMOTELY TRANSMIT TRAIL USAGE DATA EVERY DAY. THE COUNTERS WILL ALSO BE ABLE TO DISTINGUISH BETWEEN BICYCLISTS AND PEDESTRIANS. |
24,575 |
DIAGONAL COMMUNITY DEVELOPMENT CORPORATION 309 BROADWAY STREET DIAGONAL,IA50845
|
NONE |
PC |
THIS INITIATIVE WILL PROVIDE COMMUNITY-WIDE ACCESS TO SAFE WALKING ROUTES THAT ALSO CONNECT TO THE CITY'S OTHER RECREATIONAL OPPORTUNITIES. AS SHOWN IN THE AERIAL VIEW, THE PROJECT LAYOUT INCLUDES SIDEWALKS TO AND FROM DIAGONAL COMMUNITY SCHOOL, A LOOP FOR RECREATIONAL WALKING/RUNNING, CONNECTION TO THE DIAGONAL CITY PARK AND FOGLE RECREATION AREA. IT WILL INCREASE COMMUNITY HEALTH, MOBILITY, SOCIAL INTERACTION AND IMPROVE OUR SMALL TOWN ECONOMY BY MAKING OUR COMMUNITY MORE ATTRACTIVE TO NEW RESIDENTS. IT WILL ALSO HELP TO LOWER TRANSPORTATION COSTS AND INCREASE PEDESTRIAN SAFETY. |
25,000 |
EDGEWOOD BOARD OF ECONOMIC DEVELOPMENT PO BOX 185 EDGEWOOD,IA52042
|
NONE |
GOV |
THE EDGEWOOD VIKING LOOP TRAIL IS PROPOSED TO BE A PAVED, MULTI-USE TRAIL AROUND THE COMMUNITY DREAMS SPORTS AND RECREATION COMPLEX AND EDGEWOOD INDUSTRIAL PARK. THE PROJECT WILL CREATE A SAFE, ACCESSIBLE, AND ATTRACTIVE TRAIL ROUTE THAT PROMOTES THE HEALTH AND WELLNESS OF OUR COMMUNITY'S RESIDENTS AND VISITORS OF ALL AGES AND ABILITIES. THE TRAIL WILL BE CONSTRUCTED ON DONATED LAND. THE TRAIL PROPOSED IS A 10' WIDE PCC PAVED SURFACE THAT IS APPROXIMATELY ONE MILE IN LENGTH WITH CONNECTIONS TO CITY SIDEWALKS. THE 10' WIDTH OF THE TRAIL WILL INCREASE THE SAFETY AND ACCESSIBILITY OF THE TRAIL AND THE PCC PAVING WILL ENSURE THE LONGEVITY OF THE TRAIL AND WILL HELP KEEP MAINTENANCE AND UPKEEP COSTS MINIMAL. THE PROJECT'S LINKAGES TO THE CITY'S SIDEWALK NETWORK WILL CREATE A SAFE, ACCESSIBLE, CONNECTED ROUTE FOR PEOPLE WALKING AND BICYCLING, AS WELL AS THOSE WITH MOBILITY IMPAIRMENTS. |
94,300 |
EDMUNDS CENTRAL SCHOOL DISTRICT 105 1ST AVE NE ROSCOE,SD57471
|
NONE |
GOV |
OUR SCHOOL DISTRICT IS WORKING ON CONSTRUCTING AN AG INNOVATION LAB, WHICH INVOLVES THE CONSTRUCTION OF A 18 X 36 GREENHOUSE TO BE UTILIZED THROUGHOUT THE SCHOOL YEAR FOR WORK ON HORTICULTURE AND FOOD SCIENCE INVESTIGATIONS AMONG OTHER AREAS THROUGH GROWING OF FRUITS AND VEGETABLES. ONE PIECE OF THIS PROJECT IS TO CONTINUE TO EXPAND SPECIALTY CROP CONSUMPTION INITIATIVES THAT WERE STARTED THROUGH THE USDA SPECIALTY CROPS GRANT INITIATIVES IN 2017. THESE EFFORTS GREATLY INCREASED INTEREST IN AND THE CONSUMPTION OF SPECIALTY CROPS, BUT PRODUCTION VOLUME HAS ALWAYS BEEN A NAGGING ISSUE. WE ARE REQUESTING FUNDS TO COVER THE EQUIPMENT AND MATERIALS NEEDED TO GROW FRESH FRUIT AND VEGETABLES THROUGHOUT THE YEAR. THE CASH MATCH WOULD BE USED TO PURCHASE THE GREENHOUSE WHILE THE WELLMARK FOUNDATION WOULD FUND THE EQUIPMENT AND MATERIALS NEEDED TO GROW FRESH FRUIT AND VEGETABLES THROUGH GROWING BENCHES, ENVIRONMENTALLY CONTROL GROWTH TENTS, HYDROPONICS, AND AQUAPONICS. |
24,907 |
FITNESS ON MAIN 919 FRANKLIN STREET BURKE,SD57523
|
NONE |
PC |
THE SPLASH PAD INSTALLATION WILL BE PHASE ONE OF A LONG-TERM BURKE CITY PARK PROJECT THAT INCLUDES PLANNING FOR ACCESSIBLE TRAILS, NEW RESTROOMS, A NEW PAVILION, PUBLIC ART, AND UPDATED GREEN SPACES. THIS IS THE FIRST STEP IN CREATING A MORE ROBUST OUTDOOR PLAY SPACE THAT DOESN'T SIGNIFICANTLY BURDEN THE CITY OR VOLUNTEERS IN TERMS OF LONG-TERM MAINTENANCE OR STAFFING COST. IT WILL BE SUSTAINABLE FUN FOR MANY YEARS, AND WE BELIEVE IT WILL LEAD TO EVEN FURTHER PRIVATE AND PUBLIC INVESTMENT IN THE PARK CAMPUS AND OUTDOOR RECREATION IN BURKE. |
100,000 |
FOODCORPS IOWA 699 WALNUT ST SUITE 454 DES MOINES,IA50309
|
NONE |
PC |
FOODCORPS IOWA DELIVERS EVIDENCE-BACKED PROGRAM TO GRADES K-5 IN SCHOOLS, WORKING WITH STAFF, STUDENTS, AND COMMUNITY MEMBERS TO IMPLEMENT THREE EVIDENCE-BASED STRATEGIES THAT GET KIDS EATING HEALTHY: HANDS-ON LEARNING - STUDENTS GROW, COOK, AND TASTE NEW FOODS, WHICH BUILDS THEIR SKILLS AND FOOD PREFERENCES; HEALTHY SCHOOL MEALS - THE CAFETERIA EXPERIENCE STEERS STUDENTS TOWARD THE HEALTHIEST OPTIONS AND GETS THEM EXCITED TO TRY NEW HEALTHY FOODS; SCHOOL-WIDE CULTURE OF HEALTH - THE SCHOOL COMMUNITY AND ENVIRONMENT CELEBRATES HEALTHY FOOD. FOODCORPS FOCUSES HEAVILY ON REPEATED EXPERIENTIAL LEARNING OPPORTUNITIES WITH THE SAME CHILDREN THROUGHOUT THE SCHOOL YEAR. FOODCORPS IOWA COLLABORATES WITH THE IDPH AND ISU EXTENSION AND OUTREACH. |
22,000 |
FOREST AVENUE OUTREACH 1600 6TH AVENUE DES MOINES,IA50314
|
NONE |
PC |
THE FOREST AVENUE COMMUNITY ORCHARD AND GARDEN WAS FOUNDED IN THE SPRING OF 2015 AT 334 FOREST AVENUE IN THE RIVER BEND NEIGHBORHOOD. OUR COMMUNITY ORCHARD, 20 PRODUCING FRUIT TREES, PERENNIAL BERRY BUSHES, 2 30'X20' PRAIRIE PLOTS, IS NEXT TO OUR COMMUNITY GARDEN WITH 32 RAISED BEDS THAT 8 REFUGEE AND IMMIGRANT FAMILIES ARE FARMING ONSITE AGAIN THIS SEASON. PRODUCE GROWN IN THIS GARDEN IS AVAILABLE FOR YOUTH PROGRAM PARTICIPANTS TO TAKE HOME AND COOK WITH THEIR FAMILIES. EXCESS PRODUCE WILL BE SOLD AT A FARMSTAND OUTSIDE OUR BRICK AND MORTAR LOCATION ON 6TH AVENUE AND POTENTIALLY AT A NEW FARMER'S MARKET OPENING IN THE NEIGHBORHOOD. OUR YOUTH PROGRAM PARTICIPANTS WILL HAVE A LEADERSHIP ROLE IN PRODUCE SALES, LEARNING VALUABLE BUSINESS DEVELOPMENT AND MARKETING SKILLS. THE LAND SITS 15 FT HIGHER THAN THE SIDEWALK UP A STEEP EMBANKMENT WITH NO STAIRS. THIS PROJECT WILL STABILIZE THE EMBANKMENT WITH A RETAINING WALL WITH INTEGRATED STAIRS. |
15,062 |
GLENWOOD RAMS PARENT TEACHER ASSOCIATION 901 N VINE GLENWOOD,IA51534
|
NONE |
PC |
THE GOAL OF THE ADA INCLUSIVE PLAYGROUND PROJECT IS TO CREATE A SAFE PLACE WHERE ALL KIDS CAN EXPERIENCE PLAY, ENHANCE GROWTH AND DEVELOPMENT, WHERE LIMITATIONS ARE FORGOTTEN AND DIFFERENCES ARE CELEBRATED. THE PTA PLANS TO ADD NEW INTERACTIVE EQUIPMENT, SPECIALIZED EQUIPMENT DESIGNED TO ENHANCE PHYSICAL ACTIVITY FOR STUDENTS OF ALL MOBILITY LEVELS AND SOLID SURFACING ACCESS POINTS. THE USER CAPACITY OF THE PROPOSED EQUIPMENT WILL BE 264 CHILDREN. THE CURRENT DRAWINGS WILL ADD 39-45 PLAY EVENTS THAT FOLLOW ADA GUIDELINES FOR MOBILITY AND WILL HAVE THREE ACCESS RAMPS. 600 SQ FEET OF SURFACING AND 2325 SQ FEET OF CONCRETE WILL BE ADDED TO ALLOW SMOOTH SURFACE TRAVEL BETWEEN EQUIPMENT. THIS PLAYGROUND WILL BE THE ONLY ONE WITHIN THE GLENWOOD COMMUNITY THAT HAS ADA ACCESSIBLE SURFACING AND EQUIPMENT. |
25,000 |
IJAG 1111 9TH ST SUITE 268 DES MOINES,IA50314
|
NONE |
PC |
I-JAG LEADERSHIP DEVELOPMENT CONFERENCE AND CAREER DEVELOPMENT CONFERENCE SUPPORT. |
25,000 |
MAHASKA FUTUREVIEW 222 1ST AVE EAST OSKALOOSA,IA52577
|
NONE |
PC |
THIS COMMUNITY PROJECT WILL CREATE A NEW PLAY SPACE IN OSKALOOSA'S EDMUNDSON PARK, A 60 ACRE PARK THAT OFFERS A PUBLIC SWIMMING POOL, DISC GOLF, A POND FOR FISHING, A DOG PARK, BALL DIAMONDS, SHELTERS, AND A CONNECTION TO A 15 MILE CITYWIDE RECREATION TRAIL. THE PROJECT WILL CREATE A PLAYGROUND THAT WILL BE ACCESSIBLE TO INDIVIDUALS WITH DEVELOPMENTAL, MOBILITY OR OTHER CONCERNS. IT HAS BEEN DESIGNED WITH THE GOAL OF MAKING IT INCLUSIVE FOR ALL CHILDREN FROM SIX MONTHS IN AGE TO TWELVE YEARS. THOUGHTFUL PLANNING HAS CREATED BETTER OPPORTUNITIES FOR CHILDREN TO PLAY COOPERATIVELY. THERE WILL BE A SMOOTH, POURED-IN-PLACE SURFACE FOR EASE OF MOVEMENT AND INCREASED SAFETY. |
25,000 |
MERCY HOUSING MIDWEST 914 EXPLORER STREET RAPID CITY,SD57701
|
NONE |
PC |
RESIDENTS AT NORTHERN HEIGHTS AND DRIFTWOOD ESTATES HAVE EXPRESSED A NEED FOR FOOD SAFETY, NUTRITIONAL, AND CULINARY EDUCATION TO MEET THEIR FOOD SECURITY NEEDS. FUNDS WILL SUPPORT THE LAUNCH OF THE FOOD GROWTH AND SAFETY INITIATIVE, PROVIDING 270 RESIDENTS ACCESS TO ON-SITE FOOD PANTRIES, A COMMUNITY GARDEN AND ASSOCIATED FOOD SAFETY AND CULINARY EDUCATIONAL OPPORTUNITIES. THE PROJECT WILL BE AVAILABLE TO RESIDENTS AND THE SURROUNDING COMMUNITY AND WILL INCLUDE THREE MAJOR COMPONENTS: FOOD ACCESS - NORTHERN HEIGHTS COMMUNITY GARDEN FEEDS RESIDENTS; COMMUNITY HEALTH AND SAFETY COUNCIL - A GROUP OF RESIDENT LEADERS WILL ENGAGE IN COUNCIL MEETINGS FOCUSED ON PROMOTING RESIDENTIAL HEALTH AND SAFETY THROUGH IMPROVING ACCESS TO LOCAL RESOURCES; FOOD SAFETY AND CULINARY EDUCATION - RESIDENTS WILL BECOME EDUCATED AND EARN HANDS ON EXPERIENCE THROUGHOUT THE GROWING, HARVESTING, COOKING, AND STORING PROCESSES, CLASSES WILL BE TAUGHT BY RESIDENT SERVICES COORDINATOR AND EDUCATORS. |
15,000 |
METRO HIGH SCHOOL 1212 7TH STREET NE CEDAR RAPIDS,IA52401
|
NONE |
GOV |
WE WILL BUILD A GREENHOUSE TO SUPPORT NUTRITION, SCIENCE, AND AGRICULTURE EDUCATION FOR THE ENTIRE BUILDING. FURTHERMORE, PRODUCE FROM THE GARDEN WILL BE UTILIZED THROUGHOUT THE YEAR TO FEED AT-RISK POPULATIONS IN THE COMMUNITY. AFTER CONSTRUCTION, STEAM STUDENTS WILL REGULARLY UTILIZE THE GREENHOUSE FOR THEIR PROJECTS WHICH WILL INVOLVE EXISTING PARTNERS SUCH AS THE NATIONAL CZECH & SLOVAK MUSEUM & LIBRARY, FEED IOWA FIRST, AND ISU EXTENSION. THE GREENHOUSE WILL SERVE AS A CROSS-CURRICULAR LEARNING SPACE, A FARM TO TABLE NUTRITION/HEALTH PROGRAM, AN ENTREPRENEURSHIP OUTLET, AND A CULINARY ARTS WORKFORCE DEVELOPMENT. AS A PART OF THE GREENHOUSE CONSTRUCTION WE WILL ALSO BUILD IN A STOREFRONT WHERE PRODUCE WILL BE OFFERED TO THE COMMUNITY WITH AN AT-WILL DONATION COST STRUCTURE. THIS WILL IMPLICITLY ENGAGE UNDER-SERVED YOUTH. |
25,000 |
NORTH CEDAR COMMUNITY SCHOOL DISTRICT 609 125TH ST MECHANICSVILLE,IA52306
|
NONE |
GOV |
WE WILL BE PLACING A WALKING TRAIL SURROUNDING OUR CURRENT ELEMENTARY SCHOOL BUILDING AND CITY BALLPARK. WE LIVE IN A VERY RURAL COMMUNITY WHERE FINDING A SAFE PLACE TO EXERCISE SOMETIMES MEANS WALKING ON STREETS OR CROOKED SIDE WALKS. THIS WALKING TRAIL WOULD ALLOW COMMUNITY MEMBERS OF ALL AGES TO SAFELY WALK, RUN, OR PLAY. THE TRAIL WOULD SURROUND THE CURRENT ELEMENTARY SCHOOL AND BALL DIAMONDS TOTALING ABOUT 1/2 OF A MILE. WE PLAN TO HAVE MEMORIALS ALONG THE PATH FOR THESE STUDENTS, VARIOUS OUTDOOR EXERCISE EQUIPMENT FOR BOTH CHILDREN AND ADULTS, AND LIGHTING ALONG THE WAY. THIS WOULD ALSO PROVIDE A PLACE FOR STUDENTS TO WALK WHEN OUR PLAYGROUND IS NOT ACCESSIBLE DUE TO WEATHER CONDITIONS AND FOR SOCIAL-EMOTIONAL REGULATION NEEDS DURING THE SCHOOL DAY. |
25,000 |
OAKRIDGE NEIGHBORHOOD SERVICES 1401 CENTER ST DES MOINES,IA50314
|
NONE |
PC |
PLAY CITY NEEDS TO BE ENHANCED. EQUIPMENT NEEDS TO BE ADDED FOR RECREATIONAL ACTIVITIES FOR THE WHOLE FAMILY. THE TOTAL MASTER PLAN INCLUDES REPLACING THE SHELTER TO BETTER SERVE THE COMMUNITY, WALKING TRAILS, A MINI SOCCER PITCH, REHABBED BASKETBALL COURTS, ZIP LINES, CLIMBING BOULDERS AND A SPLASH PAD. WE ARE SEEKING FUNDS FOR PHASE I TO HELP COMPLETE THE FOLLOWING: CLIMBING BOULDERS - A FULL-BODY ACTIVITY WHICH INCORPORATES EVERY MAJOR MUSCLE GROUP. IT ALSO REQUIRES CAREFUL COORDINATION, PROBLEM SOLVING, LARGE AND FINE MOTOR SKILLS, AND IS TREMENDOUS STRESS REDUCER; MINI-PITCH MODULAR SOCCER FIELD - MINI-PITCH FIELD IS DESIGNED FOR FUTSAL, A FAST-PACED SMALL-SIDED SOCCER GAME, AND COMES WITH LIGHTING, FENCING, GOALS AND BENCHES; ZIPLINES - LOW-TO-MID LEVEL ZIPLINES AT PLAY CITY FOR LARGE MOTOR ENGAGEMENT, SENSORY INPUT, AND NON-STOP FUN FOR ALL AGES. ZIPLINES HAVE BECOME INCREASINGLY POPULAR IN THE LAST DECADE AND ALSO INCREASINGLY MORE AFFORDABLE. |
100,000 |
RIVER BEND FOOD BANK 4010 KIMMEL DRIVE DAVENPORT,IA52802
|
NONE |
PC |
THIS PROJECT EXPANDS RIVER BEND FOOD BANK'S PHYSICAL CAPACITY TO SAFELY STORE, MANAGE, AND DISTRIBUTE MILLIONS OF POUNDS OF NUTRITIOUS FOOD TO TENS OF THOUSANDS OF FOOD INSECURE IOWANS THROUGH OUR 300 PARTNER AGENCIES AND PROVEN FEEDING PROGRAMS. IT WILL ADD PHYSICAL SPACE FOR PEOPLE AND PRODUCTS; EXPAND PROGRAMMATIC CAPACITY TO SERVE SIGNIFICANTLY MORE MEALS EACH YEAR; ADD 8,700 SQUARE FEET OF WAREHOUSE SPACE AND MORE THAN DOUBLING THE PARKING AREA; EXPAND DRY STORAGE SPACE AND CREATE A SEGREGATED FOOD RECEIPT AREA; CREATE DEDICATED SPACE FOR THE MORE THAN 3,000 VOLUNTEERS WHO PERFORM 18,000 HOURS OF WORK TO HELP STAFF GET FOOD TO THE PEOPLE WHO NEED IT MOST; IMPROVE PARTNER AGENCY PICK-UPS BY INSTALLING A RAMP AND A SECURE, ACCESSIBLE, COVERED DOCK THAT WILL SUPPORT AND PROTECT THE VEHICLES OF THE AGENCIES THAT FACE THE ELEMENTS YEAR-ROUND TO PICK UP FOOD DIRECTLY FROM OUR WAREHOUSE ON A DAILY AND WEEKLY BASIS. |
25,000 |
STATE OF SOUTH DAKOTA DEPARTMENT OF EDUCATION 800 GOVERNORS DRIVE PIERRE,SD57501
|
NONE |
GOV |
JAG-SD LEADERSHIP AND CAREER DEVELOPMENT CONFERENCE SUPPORT. |
15,400 |
FAIRFIELD PARKS AND RECREATION FOUNDATION 1000 WEST BURLINGTON AVE FAIRFIELD,IA52556
|
NONE |
PC |
THIS PROJECT IS TO UPGRADE A HEAVILY USED SECTION OF THE FAIRFIELD LOOP TRAIL. THE TRAIL CONNECTS THE MAJOR GREEN SPACES FOUND WITHIN CITY LIMITS. IT IS ALMOST ALL OFF-ROAD AND IS 16 MILES LONG ENCIRCLING FAIRFIELD. IT IS A SUPERIOR TRAIL DUE TO ITS DIVERSITY, PASSING THROUGH WOODLANDS, ALONG DEVELOPED WETLANDS, THROUGH NATIVE PRAIRIE LAND, NEIGHBORHOODS OF VARYING SOCIAL STATUS, AND ALONG COMMERCIAL AREAS. THE TRAIL CONNECTS DIRECTLY WITH 5 CITY AND COUNTY PARKS, THE HISTORIC MAASDAM BARNS, AND MORE THAN 6 MILES OF OFF-ROAD TRAILS. THE EMERALD LOOP HAS 13 MILES OF WHEEL SPOKES, STREETS AND SIDEWALKS CONNECTING TO THE CITY'S CENTRAL PARK AS THE HUB. THIS PROJECT IS TO UPGRADE 5.0 MILES OF THE TRAIL. OVER THE YEARS GRASS HAS GROWN INTO THE SIDES AND WITHIN THE TRAIL. THE CITY MOWS THE SHOULDERS, SPRAYS FOR WEEDS, AND BLADES THE TRAIL, BUT IT IS TIME FOR MORE EXTENSIVE WORK. |
25,000 |
UNIVERSITY OF NORTHERN IOWA FOUNDATION 204 COMMONS CEDAR FALLS,IA50614
|
NONE |
PC |
A GARDEN IN EVERY LOT IS A NEW INITIATIVE OF THE UNI CENTER FOR ENERGY & ENVIRONMENTAL EDUCATION. THE PROGRAM SEEKS TO SUPPORT AND DEVELOP A CULTURE OF BACKYARD GARDENING IN THE CEDAR VALLEY. WE DO THIS BY HELPING BOTH INDIVIDUAL COMMUNITY MEMBERS AND ORGANIZATIONS OVERCOME BARRIERS TO STARTING A GARDEN THROUGH THE FOLLOWING SERVICES: GARDEN SITE ASSESSMENT & PREPARATION; TILLING AND PROVIDING SEEDS, PLANT STARTS AND MULCH; ASSISTING COMMUNITY MEMBERS IN NEGOTIATING WITH LOCAL LANDLORDS AND GOVERNMENTAL BODIES; COORDINATE GARDENING-FOCUSED EDUCATIONAL PROGRAMS AND COMMUNITY-BUILDING EVENTS IN CONCERT WITH OUR COMMUNITY PARTNERS. WITH INCREASED SUPPORT, THE GOAL IS TO INSTALL 200 GARDENS OVER THE NEXT YEAR. |
5,000 |
URBAN DREAMS 601 FOREST AVENUE DES MOINES,IA50314
|
NONE |
PC |
DONATION FOR THE URBAN DREAMS COMMUNITY CENTER. |
250,000 |
WESLEY RETIREMENT SERVICES INC 5508 NW 88TH ST JOHNSTON,IA50312
|
NONE |
PC |
HALCYON HOUSE HAS A DESIRE TO BUILD AN OUTDOOR RECREATION AND COMMUNITY GARDEN AREA ON THE WEST SIDE OF ITS CAMPUS. THE PROJECT WILL CONSIST OF THREE PICKLEBALL COURTS, A COMMUNITY GARDEN CONSISTING OF TWENTY-FOUR 4' X 8' RAISED BEDS, AND AN OUTDOOR SEATING AREA. VARIOUS TREES AND LANDSCAPING ARE INCLUDED IN THE OVERALL DESIGN AS WELL SO THAT THE AREA IS PROTECTED FROM THE HEAT OF THE SUN DURING THE WARM, SUMMER MONTHS. THE OUTDOOR SEATING AREA WILL ALLOW FOR RESIDENTS OF HALCYON HOUSE AND THE COMMUNITY AT LARGE TO RELAX AND ENGAGE IN FRIENDLY CONVERSATION, OR WATCH THEIR NEIGHBORS OR MEMBERS OF THE COMMUNITY PARTICIPATE IN PICKLEBALL. |
25,000 |
WINNESHIEK COUNTY CONSERVATION BOARD 2546 LAKE MEYER ROAD FORT ATKINSON,IA52144
|
NONE |
GOV |
THIS PROJECT WILL CONSTRUCT A NEW WALKING/BIKING BRIDGE OVER DRY RUN CREEK. THIS BRIDGE WILL BE AN ESSENTIAL COMPONENT OF THE DRY RUN TRAIL IN WINNESHIEK COUNTY. THE BRIDGE WILL BE 260'X12' CONCRETE BEAM OR TRUSS BRIDGE. IN ADDITION TO BEING A SIGNIFICANT COMPONENT OF THE DRT, THE BRIDGE WILL IMMEDIATELY PROVIDE ACCESS FROM DECORAH AND THE TROUT RUN TRAIL TO OVER 100 ACRES OF NEW PUBLIC LAND IN THE DRY RUN GREENBELT. THIS PEDESTRIAN/BIKING TRAIL BRIDGE IS AN IMPORTANT PIECE OF THE DRT, WHICH WILL EVENTUALLY BE A 9-MILE TRAIL THAT CONNECTS OUR 11-MILE TROUT RUN TRAIL (AND 3-MILE FREEPORT TRAIL) WITH OUR 20-MILE PRAIRIE FARMER RECREATIONAL TRAIL. THIS MEANS THAT UPON COMPLETION OF THE DRT, WE WILL HAVE A 40+ MILE TRAIL SYSTEM THAT CONNECTS FOUR COMMUNITIES, TWO COUNTIES, AND OVER 1,000 ACRES OF CITY, COUNTY, AND STATE PUBLIC LAND. |
25,000 |
Total ................................. 3a |
3,934,034 |